© 2023 by  The Plumbers. Proudly created with Wix.com

Enquiries@jdheating.co.uk

Tel : 02920799700

Fax : 02920 799666

Unit 13 Greenhill Court 

Spring Meadow Business Park,

Cardiff 

CF3 2ES

Shutters

Wimbledon Common

Alongside Valco and with a budget of £2.5 million we were tasked with being part of this 8000 sq ft, 7 bedroom property.

Underfloor heating to all rooms. Underground rainwater harvesting tank. 

A daikin fresh air system was installed along with dakin heat recovery air conditioning system. In addition to the VRV air-conditioning system, we installed a VAM fresh air heat recovery system. A balance is achieved between indoor and outdoor temperatures, enabling the cooling or heating load placed on the air-conditioning to be reduced significantly. The fresh air is supplied throughout the house via spiral ducting and grilles.

Please reload

Whitebreads First Green Hotel & Low Carbon Resturant , Burgess Hill

2010

Setting an ambitious target of 70% Energy reduction. Whitebread launched its second Green Premier Inn along with its first low carbon restaurant. we carried out:

A 3 stage heat recovery system. 

Ground Source Heat pumps 

Energy harvesting and grey water recycling providing 100% of the hotels toilets

Low flow shower heads

Premier Inn was one of the was one of the first hotels in the UK to achieve the prestigious Carbon Trust Triple standard.

Bathroom Renovation

Cardiff

Bathroom design and renovation  

Newbridge Tabernacle

2016 - 2017

In 2016 we were part of phase 1 renovation works of the Baptist Church. 

In 2017 the Church approached us again to carry out phase 2 works which we are currently undertaking. the works includes new WC and shower rooms. 

The George Hotel, Brecon

2016 / 2017

This renovation was to the public house and to the 4 hotel rooms with en suites.

In the public and kitchen area, we installed a new comfort cooling system.

The cellar and Bottle store cooling unit were supplied by Beer Master.

New Water softening, new washing machine and new S&S Norther Merlin interlock system was also installed.

To the hotel rooms, new air conditioning was installed along with complete new sanitary ware. 

The Royal Gwent Hospital , Newport

2017

New Air handling unit 

Domestic Dwelling Cathedral Road Cardiff

2016 / 2017

Working alongside a well known architectural company from Cardiff. The owners were looking to transform the property with a modern, high specification extension. This included new hot and cold plumbing, underfloor heating to the bespoke kitchen area. New ground floor cloakroom. En suit to the first floor along with a new family bathroom. 

BUPA, Wingham Court Claygate

2016

Run temporary waste & water services for site welfare facilities in plastic pipework, from existing  mains to site cabins. Isolate water and cap to bathrooms made available. Isolate waste services to bathrooms made available.

Strip out redundant sanitary and dispose of in skip provided. Install sanitary when other trades have completed their tasks.

On completion test & commission.

The Bell Hotel, Aylerbury

2016

this project comprised of a refurbishment of the public house and also the hotel rooms. 

Installing new sanitary in both public rest rooms and the en suits. Ventilation, comfort cooling, cellar cooling system. a new wet heating system, washing machine, S&S northern Merlin interlock system in the kitchen, with a kitchen extract system. new gas services, new hot and cold services and a water softener. 

Beefeater, Longwall Oxford

2016

New hot, cold and waste. ​​New gas run to the kitchen area. Sanitary ware installed from floor level and connected onto new hot, cold & waste services as indicated on drawings.Testing and Commissioning of new works.

The Crossbush, Arundel, Sussex

2016

At this Beefeater we carried out a complete strip out of the existing M and E. Installed new hot and cold services. New air conditioning unit. New ventilation to the kicthen area. New sanitary ware to the publice WC which included a disabled WC. 

ISV Morrisons

2015 - 2016

Working along side Bouygues UK . We were involved on the development of two new sites for affordable housing. Carrying out the plumbing and mechanical works on the two sites. 

The developments are said to be in the region of circa £14 million.

The first site comprising of  89 units - 13 x 1 bed apartment, 70 x 2 Bed apartments. 6 x town houses.

The second site comprising of 63 units - 16 x 1 Bed apartments, 47 x 2 Bed apartment. 

Cardiff Airport

2015

Drain existing heating system. Check isolation of equipment with suitable test apparatus. Isolated gas supply locally in the plant room. Remove 3no Ideal Modulating boilers. Alterations to existing iron pipework at high and low level. Pipework connected using a hand held threading machine. Installed low loss header kit. Installed boiler framework. New boilers and flue, connected onto existing pump sets.

Studio Gym, Cardiff

2015

In 2015 we were approached to carry out works on a new concept gym in Cardiff Bay.

The new concept gym was set to change the face of “gyms” in Cardiff, with not a mirror in sight.

 

Works included, complete strip out of existing mechanical works to the old warehouse unit, new hot and cold services throughout. Air conditioning, heating. New ventilation and ducting.

Bespoke sanitary ware in both male and female changing rooms. Small canteen/ kitchen area.  

Tenneco Walker, Merthyr Tydfil

2015

The existing hot & cold water and redundant sanitary appliances were removed and pipework adapted to suit new layouts with connections to sanitary & taps and sinks. Thermostatic mixing valves are fitted to all wash basins.

New above ground drainage was installed connecting onto sanitary ware etc, with a Sanivite Macerator installed to the sink in the 1st Aid Room. 

Comfort cooling, Split Air Conditioning systems. The existing ventilation was adapted and upgraded using existing grilles where possible or replacing with new grilles and diffusers. New sanitary ware and shower facilities for staff. 

A new Vent Axia Heat Recovery unit was installed above the ceiling in the conference room to work with the air conditioning.

The John Francis Basset Hotel, Cornwall

2014 / 2015

We were approached by JD Wetherspoon in 2014 regarding a project they wanted to undertake in Cornwall for a 37 bedroom hotel the works budget was set to be in the region of £2.7million. All 37 guest rooms included an en suite. We carried out all plumbing and mechanical aspects, which included all 37 en suites, kitchen, bathroom works to the main public house and specially adapted bathrooms for disabled guests. The new hotel will create 26 new jobs for the surrounding area of Camborne. 

Portcullis House, Cowbridge Road

2014

This project comprised of installing ventilation, comfort cooling, a  wet heating system, S&S Northern Merlin interlock system in the kitchen, new gas service, new hot & cold water services and a water softener over 4 floors. new male and female WC and disabled wc. 

The Stamford Post, Lincolnshire

2014

Tasked with transforming the old Stamford Mercury, Britain’s oldest continuously published newspaper. The design of the pub along with the bathroom were taken from the inspiration and influences from the buildings history in the industrial and atmospheric design. Installing the mechanical and plumbing aspects, new AC along with the feature concrete fireplace that sites at the rear of the property giving the pub a focal point. The toilets show vintage lighting, sinks and urinals along with bespoke printed tiles to the walls, showing extracts from old newspapers.

The Cornfield Garages, Eastbourne

2014

This project was an extension of the already existent public house.

New sanitary war to the public toilets were installed along with a Zubadan system comfort cooling system with a series of Lossnay and concealed units in the roof space. Indoor and outdoor fires were also installed.

Bronllwyn primary School, Rhondda Cynon Taff

2014

Classroom adaptions were required over the school holidays. Moving existing plumbing and mechanical to suit the new layout.  

The Six Gold Martlets, Sussex

2014

The public house was 8000sq feet. This project consisted of hot and cold central heating. Complete new sanitary ware to the publice area, including a disabled WC. Comfort cooling system to the cellar and bottle store.  Mitsubishi duct system to the kitchen and the public area with a series of Lossnay and concealed units in the roof space. Life science water king 3 water softening system. Interlock system in the kitchen with a kitchen extract system

The Wallaw, Northumberland

2013

A complete rip out of the existing plumbing and mechanical installation.

Renew all plumbing, sanitary and mechanical works. Install comfort cooling. New ventilation throughout, cellar and bottle cooling system.

The contract also required additional works as the project proceeded. We were able to provide the additional works for :

heat recovery units, Drainage services to the staff WC area, Sump pump, Upgrade chimney fan, alarm required by the water board, Break tan to the bin store and an outside tap.

The Star Inn, Devon

2013

We carried out the mechanical and plumbing works in line with the designer’s vision to keep the traditional pub values and mindfulness of the pub grade II listing. New air conditioning, H&C services, public toilets. Kitchen ventilation. Cellar and bottle cooling system were all installed. 

The Mardy Inn, Swansea

2013

Complete rip out existing plumbing and mechanical installation. Renew all plumbing, sanitary and mechanical works. Install comfort cooling. New ventilation throughout, cellar and bottle cooling system

The Shoulder of Mutton, Ashby De La Zouch

2013

Winning "Loo of the Year 2016" award. We carried out plumbing and Mechanical renovations on this old Woolen Factory. 

A complete rip out of the existing plumbing and mechanical installation.

Renew all plumbing, sanitary and mechanical works. Install comfort cooling. New ventilation throughout, cellar and bottle cooling system

The Mount Stuart, Cardiff

2012 / 2013

This project comprised of installing new sanitary ware to the pub, ventilation, comfort cooling, cellar cooling system. A new wet heating system, S & S Northern Merlin interlocking system in the kitchen with a kitchen extract system a new gas fired pit. Complete new gas services, hot and cold services and a water softener.

As ever, we are proud to have been part of JD Wethersoons’ vision for the new public house. However, having this one on our door step, was somewhat more special and will always be a favorite of ours.

The W.G Grace, Bristol

2012

The project was to procure, supply, deliver and install a complete new hot, cold, waste, new sanitary ware, ventilation services, heating and cooling, including a new gas main. Fit new bespoke gas fire place.

The Chapel, Churchill Way Cardiff

2012

The project was to supply and install a complete new hot, cold, waste, new sanitary ware, ventilation services, heating and cooling, Including a new gas service throughout. 

De Clare Business Park, Caerphilly

2012

The works was carried out over 8 different units. New Ventilation throughout. Hot and cold services throughout the 8 units. Gas Service. New sanitary ware . LST 42no Radiators. Foiled fiberglass insulation

H&C secondary pipework from plant room. Testing and commissioning.All 8 Units were provided with its individual O & M Manual

The Cabot Court Hotel, Weston Super Mare

2011

This project comprised of installing new sanitary ware to the hotel rooms and pub area, new ventilation, comfort cooling, cellar and bottle store cooling systems, a water storage tank, a new S&S Northern Merlin interlock system in the kitchen and two new water softeners

Please reload